The utility tunnel is 3 KM long, it is 7 m wide and 5.5 m in height.
The utility tunnel carries all the services from the central plant building (CPB)to the terminal building from east and west.
Access
Landscape Design
Sustainability
Arrivals
Interior Design
Skylights
Cantilever
Precast Concrete Arches
Concrete Sockets
Roof Structure - Shell Cassette Element Structure
UTILITY TUNNEL
Meeting with His Highness The Emir
Minister’s visit of New Terminal Construction Site
Commencement – Site Handover
Signing Day